Skip to content

Industrial products

7 products from verified manufacturers

Motors & DrivesFeatured

IE3 Three-Phase Induction Motors

TEFC squirrel-cage motors from 0.37 to 160 kW meeting IE3 premium efficiency, with class F insulation and B-rise.

MOQ 5 units Material Cast iron / aluminium frame Lead time 14 days

₹14,500 – ₹2,35,000 / unit

Kovai Pumps logoKovai PumpsVerified
PCB AssemblyFeatured

SMT PCB Assembly & Box Build

Turnkey SMT and THT assembly from prototypes to volume, including component sourcing, AOI, X-ray, ICT/FCT and box-build integration.

MOQ 500 pieces Material FR4, Aluminium core, Rogers Lead time 21 days

₹45 – ₹1,800 / board

CES Electronics logoCES ElectronicsVerified
Motors & Drives

Helical Geared Motors

Inline helical geared motors with up to 3-stage reduction for conveyors, mixers and material-handling drives.

MOQ 5 units Material Cast iron housing, case-hardened gears Lead time 21 days

₹18,500 – ₹1,45,000 / unit

Kovai Pumps logoKovai PumpsVerified
Switchgear & Panels

Control Panel Wiring & Assembly

PLC, VFD and MCC panel wiring with ferruling, labelling and FAT documentation for machine builders.

MOQ 2 units Material CRCA enclosure, Siemens / Schneider com… Lead time 28 days

Price on request

CES Electronics logoCES ElectronicsVerified
PCB Assembly

EV Battery Management System (BMS) Boards

Active and passive balancing BMS boards for 2W/3W lithium-ion packs (13S–24S) with CAN communication and thermal monitoring.

MOQ 100 pieces Material FR4 6-layer Lead time 30 days

₹1,450 – ₹6,800 / piece

CES Electronics logoCES ElectronicsVerified
Wiring Harnesses

Automotive Wiring Harnesses

Engine, chassis and dashboard harnesses for tractors, three-wheelers and EVs with 100% continuity and insulation testing on custom fixtures.

MOQ 200 sets Material PVC / XLPE cable, Yazaki & TE terminals Lead time 30 days

₹350 – ₹4,200 / set

CES Electronics logoCES ElectronicsVerified
PCB Assembly

LED Driver PCBs

Isolated and non-isolated LED drivers from 9 W to 200 W for street, flood and industrial luminaires with surge protection up to 10 kV.

MOQ 2,000 pieces Material FR4 / MCPCB Lead time 25 days

₹38 – ₹210 / piece

CES Electronics logoCES ElectronicsVerified

Can’t find exactly what you need?

Post one RFQ — we’ll invite the best-matched verified manufacturers to quote.

Post an RFQ